Skip to content

Hagbourne Farm, Oxfordshire

Originally a continuous flow dryer with 10 square silos with all associated handling equipment. Demolished everything (end of life) – wanted an on-floor store for ease of operation within the farm with less time management.

Demolition, crushed concrete (recycled for new build), site prep and disposal of waste materials.

Foundations, steel construction (erection and cladding, closing of building envelope and new concrete apron) and final build of brand new store (2,000 tonnes – 1k per side) including new electrical mains and control panel.

Included installation of on-floor drying facilities, complete with all necessary electrical works.

Full in-house project management from initial design and planning through to installation, completion and handover with ongoing consultancy and support.

BKGrainWs
Seal-Colour-Alcumus-SafeContractor-1
Elite-Logo (1)
UKCA-mark (1)
niceic-logo (1)
© BK Group 2026
Website by Eyes Down Digital